Ingenieros Constructores. Bogotá D.C. - Colombia
313 888 4196
Projects

Obras que construyen
confianza.

Un portafolio profesional permite conocer el alcance, los retos técnicos y las soluciones desarrolladas en cada proyecto.

Documented portfolio

Projects built on
technical experience.

A selection of projects and photographs from Soiling’s 2023 corporate presentation. Scope, clients and locations are shown as documented in that source.

Foundation underpinning with micropiles01
Foundation works

Foundation underpinning with micropiles

Execution of 300 metres of pre-bored micropiles to underpin and strengthen existing foundations. The solution transfers loads to competent strata and supports work around existing structures.

ClientCNVLocationMedellín

Key scope: 300 m of micropiles

Re-engineering of pre-bored micropiles02
Micropiles

Re-engineering of pre-bored micropiles

Geotechnical works involving 10,600 metres of micropiles, with lengths of up to 32 metres. The deep foundation elements were executed to suit ground conditions and project requirements.

ClientProactivaLocationSabaneta, Antioquia

Key scope: 10,600 m · up to 32 m deep

Cased micropile foundations03
Foundation works

Cased micropile foundations

Installation of cased micropiles totalling 1,800 metres, with casing installed to a depth of 18 metres. The solution met the foundation requirements defined for the project.

ClientCNVLocationRionegro, Antioquia

Key scope: 1,800 m · casing to 18 m

Self-drilling micropiles04
Micropiles

Self-drilling micropiles

Installation of 1,800 metres of R51 bars for self-drilling micropile foundations. The system combines drilling and reinforcement installation according to the design and site conditions.

ClientCNV ConstruccionesLocationRionegro, Antioquia

Key scope: 1,800 m of R51 bars

Slope stabilization — Santander05
Slope stabilization

Slope stabilization — Santander

Protection and stabilization works included 650 m³ of shotcrete, 6,680 metres of active anchors, 15,200 metres of bolts and 5,600 m² of mesh to help control the ground and protect the road.

ClientSACYRLocationMálaga–Los Curos, Santander

Key scope: 650 m³ shotcrete · anchors, bolts and mesh

Earthworks and retaining systems06
Earthworks and retaining

Earthworks and retaining systems

A combined earthworks and retaining project involving 11,000 metres of active anchors and 50,000 m³ of earthworks. The activities addressed the conditions of a road intervention on sloping terrain.

ClientAIALocationAvenida Las Palmas, Medellín

Key scope: 11,000 m anchors · 50,000 m³ earthworks

Slope stabilization — La Pintada07
Slope stabilization

Slope stabilization — La Pintada

Slope works included 11,500 metres of bolts and 16,000 m² of Tecco mesh as part of geotechnical works along the road corridor.

ClientMHCLocationPacífico 3, La Pintada

Key scope: 11,500 m bolts · 16,000 m² Tecco mesh

Tunnel advance drilling08
Tunnels

Tunnel advance drilling

Execution of 1,500 metres of drilling associated with tunnel advance operations as part of the project's specialist infrastructure works.

ClientAIALocationPCH Alejandría

Key scope: 1,500 m of drilling

Consolidation drilling and grouting09
Drilling and grouting

Consolidation drilling and grouting

Ground consolidation works included 2,500 metres of drilling and 12,000 bags of cement for the reported grouting activities on the road corridor.

ClientCoviandina / CoviandesLocationBogotá–Villavicencio corridor

Key scope: 2,500 m drilled · 12,000 cement bags

Directed micropiles for tunnel forepoling10
Tunnels

Directed micropiles for tunnel forepoling

Execution of 1,700 metres of directed micropiles and grouting for tunnel forepoling. The pre-support solution helps manage ground ahead of the excavation face.

ClientNortunelLocationBogotá–Villavicencio

Key scope: 1,700 m of micropiles and grouting

Slope stabilization — Villavicencio–Yopal road11
Slope stabilization

Slope stabilization — Villavicencio–Yopal road

Stabilization works included 37,500 metres of active anchors, 8,000 metres of passive bolts, 2,500 m³ of shotcrete and 16,000 metres of sub-horizontal drains.

ClientConcayLocationVillavicencio–Yopal road

Key scope: Anchors, bolts, shotcrete and drainage

Retaining screen and piles12
Retaining and piling

Retaining screen and piles

Construction of 1-metre-diameter piles totalling 1,700 metres, 12,000 metres of 60-tonne active anchors and 3,000 metres of sub-horizontal drains.

ClientConstructora Bienes y BienesLocationMedellín

Key scope: Ø 1 m piles · 60 t anchors · drains

Pile construction13
Foundations

Pile construction

Construction of 6,400 metres of 60-centimetre-diameter piles for deep foundations, executed to meet the structure's support requirements and project specifications.

ClientApiconLocationBogotá, Colombia

Key scope: 6,400 m of Ø 60 cm piles

¿Quieres conocer más?

Let's talk de los
retos de tu proyecto.

Contacta a nuestro equipo para consultar capacidades, servicios y posibles soluciones para tu obra.

Contactar ↗
Contact us
Let's discuss your project

¿Listos para construir
bases sólidas?

Cuéntanos sobre tu necesidad de ingeniería. Nuestro equipo podrá orientarte sobre el siguiente paso.

UbicaciónBogotá, Colombia
Business hoursMonday to Friday · 8:00 AM – 5:00 PM

Request information

Déjanos tus datos y el servicio que te interesa.

Formulario de demostración: conectar un servicio de envío antes de publicar.

Llamar WhatsApp
Llamar WhatsApp